Trail & Section Status

 

1. MUSTANG-USA PARKWAY SECTION CLOSURE

NOTICE: Due to extensive flood damage, the trail is not passable from Mustang to Tracy Power Plant. For updated information and expected opening date, contact the Nature Conservancy at 322-4990.

 

2. FLORISTON-VERDI AREA TRAIL RE-OPENINGS

The trail near Floriston is now clear of flood debris and open, as is the section between Verdi and Fleisch Bridge previously closed for construction. As of November 2017, you can travel downstream from Boca for a 2 mile out-and-back by following Hirschdale Road to its east end and then continuing on our newly built dirt trail.  Be aware that this trail does NOT yet connect to Floriston. Happy riding!

 

3. TRAIL NEAR FARAD IS ALSO NOW OPEN!

After being stuck at the Farad boulder field since September 2015, this key connecting trail segment is now completed, and you can go explore it. This short section of trail was VERY challenging, so be sure to stop and admire the rock work that went into it!  This connects the Bikeway all the way from Verdi to Floriston (12 miles) by trail.