Use the Trail: Floriston to Verdi

Note: Fleish Road is now CLOSED due to construction until approximately January! Don't forget that you can now continue over five miles beyond the suspension bridge on our new trail section.


Views of the Truckee River from Fleish Road.

Despite three steep sections, some of the
route is level forested road.

The highlight of the trail is Fleish suspension bridge,
rebuilt in 2013.


Trail Description

The utility road from Quilici Ranch to Fleish Bridge is 3.5 miles long, and is shared with TMWA vehicles, which have the right-of-way. There are 4 steep, rocky sections, and therefore the route is not for beginners or children. River views combine with forested areas along this section of the Bikeway. Non-utility motor vehicles and horses are not allowed.

Reno Iron Works was awarded top honors for the Bikeway's Fleish Bridge in the category of "Meeting the Challenge of a Difficult Job--under $500,000" by Associate General Contractors. Congratulations to Reno Iron Works and thank you for doing a great job on our bridge!

Connectivity

The Fleish utility road starts at the end of Quilici Ranch Road in Verdi. Recommended parking for cyclists is at Crystal Peak Park in Verdi. Walkers can park at the end of Quilici Ranch Road. Although access off Interstate 80 has been used by rock climbers for years, it is not the preferred access. At the present time, the Fleish Road is an out-and-back from Verdi.

Services

There are no services of any kind on this trail section. There is cell phone service on most of the route.

Video



Map Downloads

Download Floriston to Verdi segment overview
Download Verdi Punny Dip overview
Download Floriston to Farad overview

Links to other videos

Youtube video by Daniel Hall